Deterministic Hydrogen Flame Tests Projects uri icon

type

  • Technical Assessment and Assistance Contract

date/time interval

  • October 2, 2024 - November 28, 2024

keywords

  • optical sensor; optical interrogator; hydrogen flames; maximum temperature