Optimum next generation aircraft and integrated rear end (Oneire) Projects uri icon

type

  • R+D Contract

date/time interval

  • February 28, 2022 - April 28, 2023

keywords

  • hydrogen-fuelled green powertrain; aircraft powertrain design and integration