Prototype Linking Requirements to FMI Package (2021) Projects uri icon

type

  • Technical Assessment and Assistance Contract

date/time interval

  • September 16, 2021 - December 31, 2021

keywords

  • reqif; fmi; fmu; traceability; preservation; lotar; systems engineering; interoperability